Tricks, Traps and Ploys Used in Construction Scheduling, OH CLE 6.0
June 10, 2008 Independence , OH
Presented by Lorman Education Services
Single Attendee: $339.00
Use discount code D9921650 for 10% off when registering online or when registering by telephone at (866) 352-9539. Seminar ID 377721
Who Should Attend?
This seminar is designed for attorneys, construction and project managers, engineers, presidents, vice presidents, owners, architects, contractors and subcontractors.
Benefits
Stop construction nightmares in their tracks – get on the right track from the start.
Attend this informative seminar and you’ll gain an understanding of the legal issues relevant to construction project scheduling in Ohio. We’ll address critical path method scheduling and show you how to use CPM contract scheduling specifications to effectively plan and construct capital projects. You’ll learn how CPM scheduling and construction scheduling specifications can be used – and sometimes misused – to provide unreliable results or results intended to bolster delay claim positions. Don’t delay – register today to stay on the cutting edge of your field.
Benefits for You
• Tips on interpreting the significance of project delays
• Discover the magic behind a critical path method schedule
• Get the facts on schedule updates
• Learn why sharing data is important
• Explore the latest delay analysis techniques
Continuing Education Units
AIA 6.0
CC 1.0
IACET 0.6
PMI 6.0
OH CLE 6.0
OH ENG
OH HVAC CON 6.0
CC Certification
This entry was posted
on Thursday, May 8th, 2008 at 12:40 am and is filed under Ohio Engineering CE, Greater Cleveland, Akron, Ohio CLE Live, Participatory.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.